Groundbreaking: River Greenway Phase III

196 1/2 E 6th St Get Directions

Description

Join us as we celebrate the start of construction on phase III of the River Greenway with the City of Sioux Falls!

This project will provide two acres of pedestrian access and recreation opportunities along the west side of the Big Sioux River along the upper reach of the Falls. The new improvements will provide a direct connection to the Steel District development, tie into existing Falls Park pedestrian circulation routes, and lead into the future Jacobson Plaza improvements. The Lloyd Landing improvements include a riverwalk path, 30′ x 80′ lighted shelter, dog relief station, flexible field turf area, iconic selfie station, landscaping and access to the Big Sioux River. The historic low-head dam will also be replaced as part of the project, and will maintain the water level of the river through downtown.

Parking will be available on Phillips Ave. by the Cascade building.